A lot of progress is being made at this office space we are building out in Tempe! Floor prep. is taking place and carpet and luxury vinyl tile should be installed over the next two days. Also, a new glass wall and door have been installed for the conference room.  Lastly, new break room cabinets, sink, and faucet were installed and the ceiling grids have been repaired.