Major progress made prior to the foundation pour at Apple Valley Dental & Braces. ABC was installed, compaction and testing, termite treatment, storm drain & back flow device installed, back fill and grading, slurry under footing crossings at SES cabinet and at fire riser, and the moisture vapor barrier was installed.